Latest install of our LG Chem Resu 10kWh and SolarEdge supporting Inverter, Autoformer, and Meter package. I wanted to share the install notes, feedback, and most importantly, pictures of the install.
These ship in a matter of days and only take a few hours to be up and running to save you money!
- Unit came palletized and nicely packaged.
- LG RESU custom lift handles are a must for the install and moving the 215lb battery pack.
- This install was done on concrete block so 3/8" tapcon masonry bolts were used and tested to double the required capacity.
- All measurements were taken into consideration for proper spacing of components per manufacturer specification.
After a few layout discussions, the final mounts were made, components lifted, and the drop from the main circuit breaker was run to the group. The communications were wired and the units were initialized. Setup was performed, component communication tested and our proprietary programming began.
In all, each component is well designed and housed in robust IP55 rated casings, internal circuitry is laid out smartly, and the finished product has a minimal footprint.
This kit has unparalleled payback metrics, is maintenance free, and ready for prime-time in service of demand charge offset, solar charging and backup!